Sorry, you need to enable JavaScript to visit this website.

Where do the exams take place?

There are 2 available venues:

  • MADRID HEADQUARTERS

Examinations Department – Avda. Hispanidad nº 12
EDIFICIO DE CRISTAL – 2ª PLANTA – CBT 3
Examination hours from 08:30 to 14:30 hr..
Phone.: (+34) 91 301 94 38
Fax: (+34) 91 301 94 35
e-mail: Info.lma@senasa.es

  • BARCELONA HEADQUARTERS

CENTRE DE PROMOCIÓ ECONÓMICA.
AJUNTAMENT DEL PRAT DE LLOBREGAT.

If I passed some basic exams before June 12-2024, are they valid for a Part 66 LMA license?

They are valid. The only difference is that the certificate of recognition on which they appear corresponds to the EASA 148 format, while the basic examinations approved as of 12 June 2024 will appear in an EASA 148a format if they have been carried out in a Part 147 organisation, or in an EASA 148b format (if they have been carried out with the Authority).

Is it acceptable to have only one “inspected/tested” Form 1, without any other historical, to install a component?

• If the component is on condition, it is sufficient provided that block 12 indicates the tasks performed in the inspection/test and the maintenance data used (or there is traceability to the documentation where the information can be found).

• If the component is hard time (on condition with maintenance), this Form 1 would only be accepted if block 12 contains information about the last time the corresponding tasks were performed, or if Form 1 accompanies the relevant documentation with the last completion of these tasks. Preferably both.

Can the Quality Officer of an organisation Part 145, with certification authorisation with scope of basic maintenance (Category LMA license), sign the CRS for basic maintenance work?

Certifying or releasing a maintenance task by means of a TLB, CRS or EASA Form 1 is considered to be the last action in the production process of a maintenance facility, and this task is the privilege of the certifying staff duly authorised to do so. A Quality Manager of a maintenance centre, as well as the Quality System auditors, should not be involved in this production process (AMC 145.A.65 (c) 1-11), since when managing/performing quality audits, an essential component of the Quality System, the required independent nature of the quality system would be infringed.