Airports/Verified Public Use Heliports
AESA Guide Material
- Model application Certificate of Airport
- WAX-09-GUI-001-2.0: Guide to the development of the Airport Manual
- WAX-09-GUI-002-1.0: Guide to the presentation of the opinion — Document on compliance with technical standards
- WAX-09-GUI-003-1.0: Guide to the preparation of Security Studies — Exemptions
- WAX-12-GUI-042-1.0: Guide to the development of the airport SMS
- Models of Opinion Lists of Compliance with the Technical Standards of Order FOM/2086/2011
- WAX-12-GUI-034-1.0: Technical guide for the preparation of security studies in the field of SMS
- Wildlife Instructions and Guides
- Management OF CHANGE Verified/Certified Airports (RD 862/2009) (A-DAU-GCRV-01 1.0)
- ITE SMS AAT: Technical Instruction on Operational Safety Management for Land Assistance
- ITE Ground Assistance Operations: Technical Instruction on Land Assistance Operations
- INSA-11-INS-06-1.1: Technical instruction for the implementation of an action plan in the event of adverse weather conditions
- INSA-11-INS-07-1.1: Technical instruction for the assessment of runway surface friction coefficient
- INSA-11-INS-08-1.0: Technical instruction for maintenance of motion area
- INSA-11-INS-09-1.1: Technical instruction for conducting inspections of the area of movement
- INSA-11-INS-10-1.1: Technical instruction: Regrowing track
- INSA-11-INS-11-1.1: Technical instruction: Off-duty areas in the airport movement area
- INSA-11-INS-12-1.1: Technical instruction: Training requirements for airport staff
- INSA-12-INS-14-1.0: Technical Instruction on Characteristics of Non-Light Visual Aids
- INSA-12-INS-015-1.0: Technical instruction on Training of drivers and personnel with access to the movement area
- PAUT-13-INS-016-1.0: Technical instruction: Fire Rescue and Fire Extinction Service. ICAO-SEI category and level of EIS protection
- AUPC-PESM-DT01: Technical Document: Emergency Plan — Planning, conducting and evaluation of drills
- AUPC-PERN-DT01: Technical Document: Emergency Plan — Natural Risk Study
- CERA-14-GUI-056-1.0: Technical guide for the development of the Safety Management System at verified aerodromes
- AUP-PGRF-DT01 Ed.01: Technical document: Development of the wildlife risk management programme. New!
With a methodology equivalent to that of EASA, AESA has developed technical instructions and guidelines for those provisions of the legislation in which it considered it necessary to publish a technical reference material, which would make it easier for inspection stakeholders to comply with those provisions.
Documents from international civil aviation organisations and authorities such as ICAO, IATA, ACI, FAA, etc. have been taken into account in the preparation of this technical material.
Application, preparation guides and documents to be completed
Other guides and technical instructions
Applies to both certified and non-certified airports.
Contact
For queries concerning verified aerodromes for public use, please contact the AESA Verified mailbox verificados.aesa@seguridadaerea.es